Planning Board approves 22 Lincoln Road addition with six conditions

LINCOLN — February 8, 2022 — Lincoln Planning Board approves 22 Lincoln Road expansion to 10,671 square feet, attaches six conditions. The Feb. 8 vote, with Co-Chair Gary Taylor recused as an abutter, cleared a 4,029-square-foot addition to a 1927 home owned by Lu Yan Ping but explicitly withheld approval of a long-standing accessory apartment because its egress runs through a boiler room and fails current building code. Conditions include 8-to-10-foot minimum mitigation trees, a maintenance plan for 2,023 square feet of new porous pavement, and Conservation Commission sign-off on a generator added inside the 100-foot wetland buffer. Co-Chair Lynn DeLisi warned that contractor staging through the town office parking lot would be "tricky." The board also released $7,044.33 in dormant 53G funds to AT&T from a 2000 cell-tower review account; Taylor noted the underlying Omnipoint litigation cost Lincoln roughly $200,000 and became a national precedent.

Keep reading with a 14-day free trial

Subscribe to The Lincoln MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Lincoln MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Littleton Post · The Lowell Post · The Malden Post · The Marlborough Post · The Maynard Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.