Planning Board approves 10-year Verizon tower renewal and Old Concord Road site plan

LINCOLN — October 12, 2021 — Lincoln Planning Board renews Verizon tower for 10 years and splits on village-center survey. The board unanimously approved a 10-year special permit renewal for the Verizon facility at the Tracey's gas station tower, conditioned on a written statement that no FAA correspondence exists, and approved a companion equipment modification adding six antennas and six remote radio heads at the 56-foot centerline. Members also approved a site plan for an addition at 263 Old Concord Road and heard from a Climate Action Planning Subcommittee urging a town-wide plan and dedicated sustainability staff, with member Stacy Montori citing more than 65 documented gas leaks in town. The board then divided sharply over the South Lincoln village-center survey, with Bob Domnitz saying roughly 80 percent of respondents backed retaining commercial businesses against only about 40 percent for added housing and warning that board and town priorities are "not aligned well." Co-Chair Gary Taylor countered that the survey reflected a messaging failure, not rejection of housing.

Keep reading with a 14-day free trial

Subscribe to The Lincoln MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Lincoln MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Littleton Post · The Lowell Post · The Malden Post · The Marlborough Post · The Maynard Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.