Planning Board weighs South Lincoln rezoning scope and septic capacity
LINCOLN — October 27, 2020 — Lincoln Planning Board confronts septic limits and scope dispute on South Lincoln rezoning. Co-Chair Gary Taylor reported the South Lincoln Planning Advisory Committee subcommittee split three ways on geographic scope, with the Housing Commission's Alan Vander Mollen pushing for broad coverage, the Select Board's James Craig pressing to limit rezoning to the mall side of Lincoln Road, and Taylor proposing a middle position that includes Lincoln Woods and the mall but excludes the Flying Nuns and Greenridge condos. A decade-old study found the private TCB-operated treatment plant's single-wall steel tanks were already "past their life expectancy" then. "The government's not going to build this project," member Bob Domnitz said, urging private-sector outreach. The board unanimously approved Oct. 13 minutes and will fold public input on scope into its Nov. 19 State of the Town presentation.
Keep reading with a 14-day free trial
Subscribe to The Lincoln MA Post to keep reading this post and get 14 days of free access to the full post archives.
A subscription gets you:
- Subscriber-only posts and full archive
- Post comments and join the community
- 24x7 access to local news